EOLOS FLS200 BUOY DEPLOYED

EOLOS FLS200 BUOY DEPLOYED
Published: 17 . 03 . 2015

Today, March 17th 2015, the EOLOS FLS200 buoy has been deployed next to the RWE ºs IJmuiden Met Mast in the North Sea. At 6:00 the Bever vessel sailed away from IJmuiden port (Netherlands) heading towards the offshore site, located at 47 nautical miles.

The final buoy deployment took place by first lifting down the clump weight at 200m from the reference Met Mast, and later lifting down the buoy on the water. At 12.20h the overall buoy system was completely deployed and fully functioning.

 

More news

EOLOS – Stage 3+ accreditation received from DNV

15 . 10 . 2026
EOLOS continues to be at the leading edge of floating LiDAR technology credentials, having obtained its Carbon Trust Stage 3+ qualification. The technology roadmap drawn-up by Version 3 of the...
Read the full article

R&D Project Awarded to Consortium Led by EOLOS to Advance 3D Wind Flow and Wake Measurement in Offshore Wind Farms

03 . 12 . 2025
EOLOS Floating Lidar Solutions, together with the University of Stuttgart, Whiffle, TNO, Pondera, REdouble, and RWE Offshore Wind, has been selected for R&D funding under the CETPartnership...
Read the full article

NEOWIND R&D Project: Excellent execution and final results

13 . 05 . 2025
NEOWIND R&D Project: Excellent execution and final results The project led by EOLOS with collaboration from Sowento and the University of Stuttgart has reached its conclusion, successfully...
Read the full article