EOLOS FLS200 BUOY DEPLOYED


Published: 17 . 03 . 2015

Today, March 17th 2015, the EOLOS FLS200 buoy has been deployed next to the RWE ºs IJmuiden Met Mast in the North Sea. At 6:00 the Bever vessel sailed away from IJmuiden port (Netherlands) heading towards the offshore site, located at 47 nautical miles.

The final buoy deployment took place by first lifting down the clump weight at 200m from the reference Met Mast, and later lifting down the buoy on the water. At 12.20h the overall buoy system was completely deployed and fully functioning.

 

More news

Monitoring launched at Stromar Floating Offshore Wind Farm site

27 . 09 . 2023
The E38 EOLOS LiDAR was deployed at the Stromar site off the Coast of Caithness, around 50km from the Port of Wick on Friday 8 Sept. Equipped with fully independent and remote sensing devices, the...
Read the full article

EOLOS ties-up with Windpal for offshore wind resource and metocean data measurements in Japan

13 . 03 . 2023
As part of the penetration into strategic markets for wind resource and metocean campaigns, EOLOS continues to secure partnerships in order to offer the turn-key offering it is known for, using its...
Read the full article

EOLOS and BlueFloat Energy sign pioneering frame agreement for turn-key floating LiDAR campaign services

14 . 12 . 2022
EOLOS and BlueFloat Energy have signed a five-year global frame agreement for turn-key floating LiDAR campaign services, with the immediate contract award of eight campaigns representing the largest...
Read the full article